Expansion and equipping of the production facility 2026

Investment in energy and resource efficiency, production modernization and sustainable development to further strengthen PROMID’s competitiveness.

EU PROJECT · 2026
PROMID – expansion and equipping of the production facility 2026
Project value ~2.279.830,58 €
EU co-financing ~995.000,00 €
New production space 1.483 m²
Solar power plant 97,2 kW

The project involved the expansion of the production building for transport equipment manufacturing, housing shot blasting and painting equipment for surface finishing. With an additional 1.483 m², the entire ground-floor production area is functionally connected into a single production unit.

The new space is equipped with state-of-the-art, energy-efficient and technologically advanced machinery for painting and shot blasting.

The project marks another step in modernizing PROMID’s production, with an emphasis on energy efficiency, sustainability, advanced technology and reducing environmental impact.

The project addresses insufficient competitiveness and constraints on the company’s market growth caused by resource-inefficient and technologically outdated production processes.

Equipping the production facility

A new generation of production equipment

The new equipment improves energy efficiency, enhances surface finishing quality and enables a more technologically advanced production process.

P

Paint booth

A modern paint booth with an integrated conveyor system.

S

Shot blasting chamber

A shot blasting chamber with an integrated conveyor system.

C

Compressor

An energy-efficient system supporting the new production process.

☀

Solar power plant expansion

An additional 97.2 kW of installed capacity to increase the share of renewable energy.

Energy and resource efficiency

Lower environmental impact, more efficient production and a stronger technological foundation for future development.

By investing in energy and resource efficiency, the project aims to help the company adapt more quickly to environmental requirements, reduce adverse impacts on the climate and environment, and improve production sustainability.

The project also creates conditions for additional employment and greater competitiveness for PROMID.

44,65%
primary energy savings
53,07%
share of renewable energy sources
−62,45%
reduction in CO₂ emissions
−8,50%
resource consumption per unit of product
+10
new jobs
☀
RENEWABLE ENERGY SOURCES

97.2 kW of additional solar capacity

The project included the expansion of the solar power plant by 97,2 kW.

Expected annual electricity savings amount to 54.732 kWh, with a reduction in CO₂ emissions of approximately 8.70 tonnes per year.

A technological step towards sustainable production

The project represents an important step in the continued modernization of PROMID’s production capacity. The new space and equipment form an integrated, more energy-efficient production facility.

The investment further strengthens PROMID’s long-standing position as a manufacturer of transport equipment and industrial solutions for domestic and international markets.

PROMID · CONTACT

Have questions?

Feel free to get in touch with us.